Harding House, Aylesbury

Harding House, Chiltern Way Academy Aylesbury, Buckinghamshire Sector: Education Project: Refurbishment, Structural Alterations & Extensions Programme: 18 Weeks Status: Completed – November 2026 Project Overview EQB Construction has successfully completed an extensive refurbishment and extension project at Harding House, part of Chiltern Way Academy in Aylesbury, Buckinghamshire. Delivered over an 18-week programme, the project involved […]

Long Crendon School

Transforming Long Crendon During The Summer Closure EQB Construction successfully delivered a comprehensive programme of refurbishment and external improvement works at Long Crendon School, Aylesbury, during the six-week summer closure period. Working to a fixed programme ahead of the new academic year, the project required careful planning, coordination and sequencing to ensure all areas were […]

John Hampden Grammar School

Delivering Phase 1 Within a Live School Environment   EQB Construction successfully completed Phase 1 works at John Hampden Grammar School, High Wycombe, delivering a substantial programme of construction and alteration works over a 21-week period. The project involved extending and adapting the existing school facilities while maintaining operations within a live education environment. Careful […]

Chiltern Hills

EQB Construction was commissioned to enhance accessibility to the school’s existing playing fields at Chiltern Hills Academy. The project involved installing a new tarmac access road and constructing access steps to the existing playing field for students and staff. Our site team collaborated with the school to ensure minimal disruption and maximum accessibility for their […]

Wendover Library

Our team was appointed to deliver a commercial refurbishment of Wendover Library, transforming the two-storey facility into a modern, flexible space for community use. The project involved a complete internal reconfiguration and external upgrades, tailored to meet the evolving needs of the client.

Overstone Combined School

Our team was recently appointed to undertake extensive refurbishment works at Overstone Combined School. The scheme included the modification of their existing facilities and the introduction of a new ASD (Autistic Spectrum Disorder) unit for the occupants.   The internal refurbishment included: Full re-plastering of internal walls and ceilings Installation of new floor finishes throughout […]

The Old Forge, Slapton

Our team carried out an extensive change of use project in Buckinghamshire to convert a six-bedroom residential bungalow into a new purpose-built children’s home to support Buckinghamshire Council’s growing need for young adult social housing.   The new facility now has four bedrooms, three bathrooms, a kitchen, a utility room, a meeting/games room, and secure […]

Cottesloe School WC’s

Our team was appointed to carry out refurbishment works at Cottesloe School, Wing. The scheme required us to convert an existing underutilised space within the school into a brand-new 700 sq ft open-plan toilet block for the building’s occupants. The result was a refreshed and functional space designed to meet the daily needs of the […]

Chesham Library

Our team was appointed to carry out a comprehensive internal and external upgrade over two floors, designed to modernise the facility and improve functionality for both staff and visitors at Chesham Library. Scope Summary: Reconfiguration of the library area Refurbishment of staff facilities Installation of a teapoint and WC amenities Facade refurbishment This comprehensive project […]

Bearbrook Combined School

Our team was appointed to refurbish and create a new SEND unit within Bearbrook Combined School, Aylesbury, as well as carry out extensive external refurbishment works to construct a new external play area. The scheme included two small extensions to create new meeting/office spaces for the occupiers.  The existing space was divided up to create […]